Five Sets Electrical Testing Equipment ready for shipment

Publish Time: 2021-02-20     Origin: Site

At the beginning of February, we completed the production of 5 sets equipment. Which includes GDGS Transformer Tan Delta Tester,GDRZ-902 Transformer SFRA,GDGK-307 Circuit Breaker Analyzer,GDBR-P Transformer On Load and No Load Tester and GD-II Metal Oxide Surge Arrester MOA Tester. With the end of the Chinese New Year holiday, these devices will be shipped to our customer next week.

Product Inquiry

Warmly welcome customers from Australia to visit our Transformer Oil Purifier and Transformer Vacuum Pumping Unit workshop

Warmly Welcome Customers from Indonesia to Visit Our Transformer Oil Purifier Factory

4000LPH Double Stages Transformer Oil Purifier with PPM Meter ready for shipment

6000LPH Double Stages Transformer Oil Purifier with Trailer and Closed door ready for shipment

Three Sets DC Hipot Testers ready for shipment