    How To Slash Transformer Maintenance Downtime Safely: The Power of 3-Phase Testing And Auto-Demagnetization
    Engineers who have worked in substations know that there is no room for negotiation regarding outage windows. For industrial users, every hour of extended outage time can easily result in tens of thousands of dollars in lost energy. Beyond the direct economic impact, the logistical pressure of resch
  • 2026-07-30

    AC Hipot Tester Capacity: How to Calculate kVA Matrix & Avoid Overpaying
    How to select the capacity of a power frequency withstand voltage test device? This article analyzes the kVA calculation formula under the IEC/IEEE standard, provides a quick reference table for capacity selection of test objects such as 10kV to 110kV cables and transformers, and compares and analyzes the overseas 60Hz and domestic 50Hz environments to help you accurately match equipment, avoid blindly leaving margins, and truly save on procurement costs.
  • 2026-07-22

    Circuit Breaker Test, CT Calibration & Heat Run – SLQ Series High Current Injector
    High-current testing is no longer simply a matter of "big enough."Many people on the front lines of power commissioning hold a long-standing misconception: that as long as a high-current generator's output current value meets the standard, it can successfully complete on-site testing and pass projec
  • Total 65 pages  Go to Page
  • Go

QUICK LINK

PRODUCT LIST

CONTACT US

Phone : +86 15123029885
Add : Building 26, Yubei Intelligent Manufacturing Industrial Park,Liangjiang District, Chongqing, 401120, China.
E-mail : gold05@hy-industry.com
Whatsapp : +8615123029885
Wechat : + 8615123029885
Copyright  Chongqing Gold Mechanical&Electrical Equipment Co.,Ltd. All rights reserved. Site Map
公安备案号 50010802002590